Technical
& Economic Feasibility and Detailed Engineering Design of Dual
Carriageway, Gujranwala- Kharian 94 Km section of National Highway N-5 -
Fourth IBRD Highway Project Loan 2841 Pak |
 |
Technical
& Economic Feasibility and Detailed Design of Overlay for Existing Carriageway
Gujranwala -Kharian Section of National Highway N-5 (57 Kms), Fourth IBRD
Hwy Project Loan 2841 Pak
|
 |
Preparation
of Proposal for Design & Construction of Lahore-Faisalabad Highway (120
Kms) on BOT basis for Frontier Works Organization
|
 |
Preparation
of Proposal for Design & Construction of Highway on a New Alignment
Across Lakh Pass (alternative to tunnel) on BOT Basis- National Highway N-40
|
 |
Detailed
Design and Construction Supervision of Farm to Market Roads Project Phase
II: Balochistan-ADB Loan 917 Pak (SF)
|
 |
Detailed
Engineering Design and Construction Supervision of Farm to Market Roads
Project Phase II: Sukkur & Larkana Districts of Sindh Loan 917 Pak (SF)
|
 |
Detailed
Engineering Design and Construction Supervision of Farm to Market Roads
Project in Khairpur District of the province of Sindh-Loan No 917 Pak (SF)
|
 |
Supervision
Services for the Construction of National Highway N-40 between Dalbandin and
Nokkundi- 86 Kilometers, Section III-A, Balochistan
|
 |
Supervision
Services for the Construction of National Highway N-40 between Dalbandin and
Nokkundi, 88 Kilometers, Sections III-B, Balochistan
|
 |
Design
Vetting & Supervision Service for the Construction of Overlay on
National Highway N-5 between Gujranwala and Kharian (57) Kms - Contract 8bI,
4th IBRD Hwy Project Loan 2841 Pak
|
 |
Design
and Supervision Services for Overlay on National Highway N-5 between Lahore
and Gujranwala (40 Kms), including rehabilitation/ widening of Structures
and Improvement of Urban Areas-Pavital section
|
 |
Detailed
Engineering Design & Technical & Economic Feasibilitay Study for
Gawadar Ratodero Motorway, Khuzdar- Karkh- Shahdad Kot Section- 208 Kms
including Nineteen Major Bridges
|
 |
Construction
Supervision Services for Contract Package I (35 Km) of Khuzdar Shahdadkot
Section of Gawadar Ratodero Motorway
|
 |
Design
of National Highway N-40 & Updating Technical and Economic Feasibility
study for Improvement of Lakhpass - Nokkundi Section (478 Kms)
|
 |
Detailed
Engineering Design & Construction Supervision of Asian Development Bank
financed Rural Access Roads Project Phase-1 Sindh - Loan 1185 & 1401 Pak
(SF)
|
 |
Detailed
Engineering Design and Construction Supervision of Asian Development Bank
financed Rural Access Roads Project Phase I Balochistan -Loan 1185 &
1401 Pak (SF)
|
 |
Construction
Supervision of FHP Contract 7a, 7b and 8a Gujranwala to Kharian Section of
94 Kms on National Highway N-5, IBRD Loan 2841 Pak
|
 |
Detailed
Engineering Design for World Bank Financed MBRP/RSP-7156, RSP-7157 and
RSP-7158 Sections on National Highway N-5 at Sanjani, Hasanabdal and Wah
Cantt 9 Kms, - Loan 2841 Pak
|
 |
Design
Vetting & Supervision Services for Overlay on National Hwy N-5- Lahore
to Okara (40) Kms, including rehabilitation/ widening of structures &
Improvement of Urban Areas-Pavital Section, Phase III
|
 |
Feasibility
Study & Detailed Design for the Improvement and Rehabilitation of N-65
Km 90 to Km 155 (from Dera Allahyar to Nuttal)
|
 |
Design
for Widening and Rehabilitation of Ahmed Pur East to Yazman Road, Length (60
Kms)
|
 |
Feasibility
Study and Design for the Improvement and Rehabilitation of Bela to Kararo
Section of N-25 between Km 182 to Km 222 (40 Kms)
|
 |
Preparation
of Shop Drawings for Islamabad-Peshawar Motorway (M-1) -160 Kms |
 |
Review
of Islamabad-Peshawar Motorway Project (M-1) for National Highway Authority
|
 |
Feasibility
Study for Prioritization of Rural Roads for Design and Construction-Balochistan
|
 |
Data
Analysis for Feasibility Studies for Rural Roads for Design &
Construction Under Japanese Funding in NWFP, Sindh & Punjab
|
 |
Hwy
Rehabilitation and Maintenance Project-Medium Term Highway Sector investment
Plan, World Bank (PK-PE-1 0539)
|
 |
North
West Frontier Province-Urban Development Project-ADB TA -2940-Pak
|
 |
Consultancy
Services for Support During Planning and Implementation of NWFP Community
Infrastructure Project-CR 2829 Pak
|
 |
Institutional
Strengthening of National Housing Authority - CR 2829-Pak
|
 |
National
Procurement Reforms Programme (NPRP) -TF-028753.Pakistan
|
 |
Socio-Economic
Survey, Surface and Ground Water Survey and Soil Survey for Chashma Right
Bank 1st Lift Canal Irrigation Project, D.I.Khan
|
 |
Consultancy
Services for Water Rights Phase I and II, & Soil Survey for Development
of Irrigation Based Upon Flood Flows of D.G. Khan Hill Torrents.
|
 |
Project
Management for Construction of Tainpura Dam II and Irrigation Channels
|
 |
Project
Management for Construction of Pira Fatehal Dam and Irrigation Channels
|
 |
Detailed
Engineering Design and Construction Supervision of Infrastructrue and
Township at the Copper Gold Complex Saindak. |
 |
Gadoon
Amazai Industrial Estate Environment Impact Assessment Study, Evaluation of
Master Plan for Industral Estate and Township |
 |
Master
Planning, Detailed Engineering Design for the Gulshan-e-Rail Township in
Khana Kaccha, Lahore
|
 |
Master
Planning, Detailed Engineering Design and Construction Supervision of the
RAIL VIEW Township in Rawalpindi
|
 |
Design
of Civil Works for Askari Power Plant (50 MW) at Nizampur
|
 |
Civil
Structures Building Works for 7.5 MW Thermal Power Plant Project at Attock
Refinery Limited, Morgah, Rawalpindi |
 |
Agricultural
Sector Energy Conservation -Tubewell Energy Audits and Survey Project
|
 |
Design
and Construction Supervision of Crude Decanting Station and New Crude Tank
for Attock Refinery Limited, Morgah, Rawalpindi
|
 |
Interior
Design and Construction of Askari Information Systems Corporate Offices
-Turnkey Basis |
 |
Interior
Design and Construction of DHL Corporate Offices, Islamabad - Turnkey Basis
|
 |
Project
Preparation for Low Cost Urban Housing Project -25,000 units in 25 Selected
districts of Pakistan |
 |
Design
of Income Tax Offices for Azad Jammu & Kashmir Government
|